New Pool Construction

We've assembled a step-by-step outline to help you know what to expect.

Excavation for a vinyl-lined pool is a job for an experienced backhoe operator. Normally the side excavation is approximately two feet beyond the finished pool perimeter to allow for assembly and a concrete footing to be installed.
Step Two

Step Two

Excavation for a vinyl-lined pool is a job for an experienced backhoe operator. Normally the side excavation is approximately two feet beyond the finished pool perimeter to allow for assembly and a concrete footing to be installed.
pool construction

Step Three

Most builders pour the concrete decking once all of step two is completed but in some cases and with certain water table situations, the liner will be installed before the decking is poured. The pool structure is strong enough to allow installation to proceed in either manner.led.
pool liner installation

Step Four

In this photo we see the liner being installed. This is where an experienced expert makes all the difference!
pool steps in backyard

Step Five

Fill it with water and enjoy all of the health, fitness and entertainment value of a spectacular poolscape in your backyard!